| Alert | Type | Asset | Status | Source | Raised | Actions | |
|---|---|---|---|---|---|---|---|
HVAC Unit B predicted failure (85%) CriticalALT-01 | Predictive | HVAC Rooftop Unit B | Open | AI Engine | 3h ago | ||
Server R740 inlet temp 85ยฐC CriticalALT-02 | Threshold | Dell PowerEdge R740 Server | Acknowledged | Telemetry | 6h ago | ||
Infusion Pump #12 signal loss 52h CriticalALT-03 | Tracking | Infusion Pump Fleet #12 | Escalated | RTLS Monitor | 2d ago | ||
Loading Dock geofence dwell breach WarningALT-04 | Geofence | Caterpillar Forklift Model X | Open | Geofence | 2h ago | ||
CNC Mill #3 over-utilization WarningALT-05 | Anomaly | CNC Milling Machine #3 | Open | AI Engine | 14h ago | ||
Reefer temperature drift +4ยฐC WarningALT-06 | Threshold | Cold Chain Reefer Unit | Acknowledged | Sensor | 20h ago | ||
Gateway GW-05 offline WarningALT-07 | Device | โ | Open | IoT Platform | 3h ago | ||
X-Ray beacon low battery (18%) InfoALT-08 | Device | Portable X-Ray Machine | Resolved | Sensor | 1d ago |