The AI command center โ risk, predictions, anomalies and realized savings.
4 assets above the risk-60 action threshold.
Vibration telemetry shows an accelerating fault signature. 85% probability of failure within 4 days.
Refurbishing the drive assembly costs 12% of replacement and adds ~18 months of service life.
5 portable X-Ray units in North Wing sit at <10% utilization while South Wing runs over capacity.
Book value near zero, warranty expired, health score 30. Recommend replacement planning this quarter.
Running at 96% utilization for 30 consecutive days โ accelerating spindle-bearing wear.
Asset not scanned in 52 hours and last seen leaving Ward 2B outside its geofence. Battery near depletion.