Reliability, PM compliance and the work-order pipeline.
Vibration telemetry shows an accelerating fault signature. 85% probability of failure within 4 days.
Running at 96% utilization for 30 consecutive days โ accelerating spindle-bearing wear.
| Work Order | Asset | Priority | Assigned | Due | Status |
|---|---|---|---|---|---|
| WO-5004 Replace worn drive belt | Reach Truck RT-220 | High | Diego Martinez | 0s ago | In Progress |
| WO-5002 Emergency server thermal shutdown risk | Dell PowerEdge R740 Server | Critical | James Park | in 1d | In Progress |
| WO-5007 Reefer refrigerant top-up | Cold Chain Reefer Unit | High | Tom Fisher | in 1d | On Hold |
| WO-5009 Locate & recover missing infusion pump | Infusion Pump Fleet #12 | Critical | Unassigned | in 1d | New |
| WO-5001 Investigate abnormal vibration | HVAC Rooftop Unit B | Critical | Unassigned | in 2d | New |
| WO-5005 Spindle bearing wear inspection | CNC Milling Machine #3 | High | Elena Ortiz | in 3d | Assigned |